Plant rooms are located at mezzanine and roof level
نوشته شده توسط : stableseat

To save energy, heat recovery will be used on exhaust systems and rates of ventilation will be closely related to occupancy and under the control of the building management system (BMS). Extract from bathroom pods will be via a single blade damper connection to 125mm galvanised ducts that feed into the main extract systems. +44 (0)161 762 2336E-mail: pr@senior-hargreaves. Heating and ventilation ductwork installation will take pace during the 43 week fit out phase.Phil Johnson, Senior Hargreaves, Tel.uk/ha166/4541ha1a. This is the final phase of Liverpool One, a £920 million, 42 acre investment by Grosvenor Estates. Kier Build is responsible for overall project delivery including services design, construction the crucial fit out phase with Kier’s M&E department.

Plant rooms are located at mezzanine and roof level.htmSenior Hargreaves is the UK's largest ductwork manufacturer.The Liverpool HiltonSpecialist HVAC contractor Senior Hargreaves is supplying the prestigious Liverpool Hilton Hotel with ventilation ductwork and smoke extract ductwork.co.

 They produce over 4,000 tonnes of HVAC ductwork each year for a diverse range of construction applications. The apartments are ventilated on a whole house basis with final connections by 204mm space saving plastic ductwork. Forty seven luxury apartments are included in the development.

High/low resolution images are on the web at ainsmag. For maximum flexibility and to give guests control, air input to bedrooms will be cooled or tempered by individual fan coil units. These systems also have heat recovery, but are not connected to the hotel BMS. Opening is Shower Curtain Rods Manufacturers scheduled for summer 2009.co.uk hargreaves-ductwork. Hargreaves standard specification stability, integrity and insulated HFD ducting is also used for smoke extract and make-up air in the basement. Continuous airflow is maintained at all times with facilities for occupiers to increase rates of air flow, heating and cooling as desired. Hargreaves will supply and install backbone ductwork for air delivery and removal and for the smaller final connections.

The contract will ensure comfort and fire safety for guests and staff at the 215 bedroom hotel.co. This is an insulated duct with access panels to permit thorough cleaning. These ducts pass through the building to discharge at mezzanine plant room height.Echoing the elegant lines of the Bath terraces, the crescent shaped building will face Chavasse Park, a large area of open space with underground parking beneath.. Staff kitchens in the basement and the restaurant kitchen at ground floor level are ventilated by Hargreaves HFD kitchen extract fire duct. +44 (0)161 764 5082 Fax.ukSenior Hargreaves, Lord Street, Bury, Lancashire BL9 0RG, UKThis release was published on openPR. The hotel was designed by internationally acclaimed architects Aedas and Kier Build Limited is the main contractor. Lavish public rooms, including top class restaurants, bars, health club, meeting rooms and conference suites will set the tone for the development. This conditioned air will be delivered via a bulkhead plenum and grille into the room. The HFD range of fully tested fire resistant ductwork is designed for smoke extract and ventilation in fire engineering projects, where safe evacuation of people is vital





:: بازدید از این مطلب : 109
|
امتیاز مطلب : 0
|
تعداد امتیازدهندگان : 0
|
مجموع امتیاز : 0
تاریخ انتشار : چهار شنبه 1 آبان 1398 | نظرات ()
مطالب مرتبط با این پست
لیست
می توانید دیدگاه خود را بنویسید


نام
آدرس ایمیل
وب سایت/بلاگ
:) :( ;) :D
;)) :X :? :P
:* =(( :O };-
:B /:) =DD :S
-) :-(( :-| :-))
نظر خصوصی

 کد را وارد نمایید:

آپلود عکس دلخواه: